Rev | SWE Statement | ||||||||
---|---|---|---|---|---|---|---|---|---|
A | 4.4.2 The project shall select and record the selection of specific measures in the following areas:
| ||||||||
Difference between A and B | Made the requirement based on software Class and Safety Criticality; Added requirement to establish metrics repository / system from Rev A SWE-095. Removed requirement for requirements volatility and software characteristics; Added development effort and cost data to list of measures. | ||||||||
B | 2.1.3.9 For Class A, B, C, and safety-critical software projects, the Center Director shall establish and maintain a software measurement repository for software project measurements containing at a minimum:
| ||||||||
Difference between B and C | Removed "safety-critical" from the requirement. | ||||||||
C |
| ||||||||
Difference between C and D | No Change | ||||||||