bannerd

Search

Search

Help

Page 1 of 6. Showing 53 results (0.008 seconds)

  1. 7.15 - Relationship Between NPR 7150.2 and NASA-STD-7009

    Software safety plan 130 Supplemental   IV&V Plan 131 Supplemental   Classification assessment 132 Not Related   Software … of spacecraft and plume models. Analysis should be conducted on early and final designs." sre ll pi v-v Migration of unmigrated content due
  2. 7.06 - Software Test Estimation and Testing Levels

    SWE-114 Software Test Procedures SWE-118 Software Test Report 6. References 6.1 Tools sa acq_plan cdr in/over pf pdr pp pm v-v
  3. SWE-114 - Software Test Procedures

    ." cd smproj procedure ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pm v-v trr Migration of unmigrated content due to installation of a new plugin
  4. SWE-118 - Software Test Report

    verifications; may include NASA Independent Verification and Validation (IV&V) if those services are being used for the project. Maintenance under configuration … There are currently no Lessons Learned identified for this requirement. cd smproj reports sa ansc asc bsc bnsc csc cnsc dsc g f esc pi pm v-v sar Migration
  5. 7.12 - Qualification of Flight Software

    process activities of configuration management (CM), assurance, Verification and Validation (V&V), and reviews.  Additional guidance regarding the plans … , SWE-110, SWE-111, SWE-112, and SWE-116.  The key feature of flight software qualification is the assessment that all necessary activities (V&V, testing
  6. SWE-135 - Static Analysis

    : During this IV&V phase, two parallel activities are performed: (1) coding analysis and (2) testing. Coding analysis includes version comparison, textual … analysis when used to evaluate military avionics software. ivv cd smproj tool analysis ansc asc bsc bnsc csc cnsc dsc esc ll pm v-v Migration
  7. SWE-131 - Independent Verification and Validation Project Execution Plan

    1. Requirements 2.2.1.3 If a project is selected for software Independent Verification and Validation (IV&V) by the NASA Chief, Safety and Mission Assurance, the NASA IV&V program shall develop an IV&V Project Execution Plan (IPEP). 1.1 Notes Note: The selection of projects and capabilities by the Chief, Safety
  8. SWE-054 - Corrective Action for Inconsistencies

    ansc asc bsc bnsc csc cm dsc design g f esc ll pi pm c-i v-v pm-c Migration of unmigrated content due to installation of a new plugin
  9. 7.08 - Maturity of Life Cycle Products at Milestone Reviews

    2.1 Tools records sdr procedure process studies sre srr cdr design orr mcr mdr pi pdr plan pm c-i v-v sar sir trr Migration of unmigrated content
  10. SWE-104 - Software Test Plan

    cnsc cdr dsc dnsc g f esc ll pi pdr plan pm v-v sir trr Migration of unmigrated content due to installation of a new plugin