bannerd

Search

Search

Help

Page 1 of 2. Showing 17 results (0.008 seconds)

  1. SWE-130 - Develop a Software Safety Plan

    identified for this requirement. hqce sam csma smproj sdr sa sse srr swrr acq_plan ansc asc bsc bnsc csc cm cdr dsc g f esc h pdr pe plan pm bp sar Migration
  2. SWE-106 - Software Assurance Plan

    for required changes that may be discovered during this testing." hqce csma smproj sse swrr acq_plan analysis ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pf
  3. SWE-033 - Acquisition vs. Development Assessment

    ? "Trade studies and risk identification must be performed before committing to the use of a particular unit and integration architecture." cd smproj sse
  4. SWE-038 - Acquisition Planning

    Learned No Lessons Learned have currently been identified for this requirement. cd smproj sdr sse srr swrr acq_plan ansc asc bsc bnsc csc cnsc dsc dnsc g f
  5. SWE-035 - Supplier Selection

    of action (e.g., modification or additional testing) in cases where a subsystem did not meet the checklist's acceptance criteria."   cd procedure sse srr swrr
  6. SWE-013 - Software Plans

    for this requirement. hqce sam smproj sdr sa sse srr train swrr ansc asc bsc bnsc csc cnsc cm cdr ensc dsc dnsc g f esc mcr mdr pdr pe pp plan pm c-i v-v m-a sir trr
  7. SWE-043 - Track Change Request

    updates/upgrades of both software and hardware products." sam cce cd smproj reports records sa sm sse acq_plan ansc asc bsc bnsc csc cnsc cm dsc g f esc ll
  8. 7.09 - Entrance and Exit Criteria

    1 1 Entrance and Exit Criteria Background This guidance provides the maximum set of life cycle review entrance and exit criteria for software projects and should be tailored for the project class. This guidance is a summarized collection of material from the following core documents: NPR 7123.1, App
  9. SWE-037 - Software Milestones

    for reviewing and auditing contractor progress were in place. cd smproj sdr sa pr sre sse srr swrr ansc asc bsc bnsc csc cnsc dsc dnsc design g f esc ll
  10. SWE-102 - SW Development-Management Plan

    smproj sdr sa sse srr train swrr ansc asc bsc bnsc csc cnsc cm cdr dsc dnsc g f esc ll mcr mdr pdr pe pp plan pm m-a pm-c Migration of unmigrated content due