bannerd

Search

Search

Help

Page 1 of 8. Showing 71 results (0.013 seconds)

  1. 7.04 - Flowdown of NPR Requirements on Contracts and to Other Centers in Multi-Center Projects

    sam cd sa acq_plan pf pp plan pm pm-c Migration of unmigrated content due to installation of a new plugin
  2. 7.06 - Software Test Estimation and Testing Levels

    information on test planning can be found in SWE-104. Software Assurance (SA) is typically present at the Flight Software (FSW) Acceptance Review. Presentation1.jpg … SWE-114 Software Test Procedures SWE-118 Software Test Report 6. References 6.1 Tools sa acq_plan cdr in/over pf pdr pp pm v-v
  3. 7.12 - Qualification of Flight Software

    . Resources 5.1 Tools sra records sa sre sm cm design frr orr pi pm c-i v-v prod_desc sar Migration of unmigrated content due to installation of a new
  4. SWE-018 - Software Activities Review

    that discrepancies between the review team and the Project can be resolved immediately.". sam ivv csma cce cd smproj reports records sa process ansc asc bsc bnsc csc
  5. SWE-130 - Develop a Software Safety Plan

    identified for this requirement. hqce sam csma smproj sdr sa sse srr swrr acq_plan ansc asc bsc bnsc csc cm cdr dsc g f esc h pdr pe plan pm bp sar Migration
  6. SWE-005 - Software Processes

    verification activities. Manage FSW development using an integrated system. hqce csma cce cd records sa process train ansc asc bsc bnsc csc cnsc cm ensc dsc
  7. SWE-074 - Document Maintenance Plan

    , and develop contingency plans for all operations that cannot be adequately placed under NASA's control." sam cd smproj sdr sa srr ansc asc bsc bnsc
  8. SWE-045 - Project Participation in Audits

    the adequacy of contractor implementation throughout the software life cycle." sam cd smproj sa process acq_plan ansc asc bsc bnsc csc cnsc dsc g f esc ll pp pm
  9. SWE-076 - Implement Operations, Maintenance, and Retirement Activities

    the prototype system after deployment. "Select COTS COTS products with the ability to do internal logging." sam cd sdr sa srr acq_plan ansc asc bsc bnsc csc cnsc
  10. SWE-075 - Plan Operations, Maintenance, Retirement

    to enhance the product without tearing down and rebuilding the majority of code." sam cd sdr sa srr ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pc mcr mdr