  1. 7.11 - Model Based Development and Auto-generated Code

    6 6 1. Introduction Model-based software development uses a model as the centerpiece of the development process. Software … is continually refined throughout the development process and can even be executable. For maximum benefit, the generated code should not be modified by software
  2. SWE-026 - Commitment Change Agreements

    is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used to achieve … avenues exist to obtain formal commitment to changes in plans. First, the change control process requires formal evaluation and agreement and signoff by relevant
  3. SWE-095 - Directorate Measurement System

    indicators of software quality. To provide baseline information for future process improvement activities. With these high-level goals in mind, Mission … No. 3556: "The design, development, and sustaining support of Launch Processing System (LPS) application software for the Space Shuttle Program provide the driving
  4. 7.08 - Maturity of Life Cycle Products at Milestone Reviews

    represents the current consensus guidance from this collection, collation, and review process. NPR 7150.2 does include life cycle products which are not included … 2.1 Tools records sdr procedure process studies sre srr cdr design orr mcr mdr pi pdr plan pm c-i v-v sar sir trr Migration of unmigrated content
  5. SWE-018 - Software Activities Review

    Class G is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used … process (see SWE-020) and safety criticality determination process (see SWE-133) when making the choice of review frequency. Regular reviews cover details of work
  6. SWE-005 - Software Processes

    1. Requirements 1.2.4 Each Center shall establish, document, execute, and maintain software processes. 1.1 Notes NPR 7150.2, NASA Software Engineering … (Center)." P (Center) means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used to achieve this requirement
  7. SWE-045 - Project Participation in Audits

    1. Requirements 2.6.2.3 The project shall participate in any joint NASA/contractor audits of the software development process and software configuration management process. 1.1 Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requirement. 1.2 Applicability Across
  8. SWE-096 - Directorate Measurement Objectives

    measurement are to Understand and model software engineering processes and products. Aid in the management of projects. Guide improvements in software engineering processes. The Mission Directorate plan will settle on and document the goals and objectives specifically chosen for its programs and projects
  9. SWE-016 - Software Schedule

    Center-defined process which meets a non-empty subset of the full requirement can be used to achieve this requirement. 2. Rationale The achievement … is an essential component of planning and managing the activities of a project. The process of creating a network schedule provides a standard method for defining
  10. 7.09 - Entrance and Exit Criteria

    Including the resources in the list below, information was pulled and consolidated based on repetition between Center Process Asset Libraries (PALs) and documents … Review panel agrees that: Process for allocation and control of requirements throughout all levels is deemed sound; plan is defined to complete