Page 1 of 4. Showing 33 results (0.014 seconds)
7.11 - Model Based Development and Auto-generated Code
6 6 1. Introduction Model-based software development uses a model as the centerpiece of the development process. Software … is continually refined throughout the development process and can even be executable. For maximum benefit, the generated code should not be modified by softwareSWE-095 - Directorate Measurement System
indicators of software quality. To provide baseline information for future process improvement activities. With these high-level goals in mind, Mission … No. 3556: "The design, development, and sustaining support of Launch Processing System (LPS) application software for the Space Shuttle Program provide the drivingSWE-026 - Commitment Change Agreements
is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used to achieve … avenues exist to obtain formal commitment to changes in plans. First, the change control process requires formal evaluation and agreement and signoff by relevantSWE-096 - Directorate Measurement Objectives
measurement are to Understand and model software engineering processes and products. Aid in the management of projects. Guide improvements in software engineering processes. The Mission Directorate plan will settle on and document the goals and objectives specifically chosen for its programs and projectsSWE-134 - Safety Critical Software Requirements
operations/activities. The requirements contained in this section complement the processes identified in NASA-STD-8719.13, NASA Software Safety Standard. Software … , periodic memory scrub, and space partitioning to provide protection against inadvertent memory modification. Features of the processor and/or operating system can7.08 - Maturity of Life Cycle Products at Milestone Reviews
represents the current consensus guidance from this collection, collation, and review process. NPR 7150.2 does include life cycle products which are not included … 2.1 Tools records sdr procedure process studies sre srr cdr design orr mcr mdr pi pdr plan pm c-i v-v sar sir trr Migration of unmigrated contentSWE-060 - Coding Software
work product issues). An IDE developed for a particular application may have more tools. The Process Asset Library (PAL) at the performing Center is the first … across their interfaces, and implementing the processing algorithms allocated to each component of the software work product. The software team performs codeSWE-018 - Software Activities Review
Class G is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used … process (see SWE-020) and safety criticality determination process (see SWE-133) when making the choice of review frequency. Regular reviews cover details of workSWE-024 - Plan Tracking
Critical and Class G are labeled with "P (Center)." This means that an approved Center-defined process that meets a non-empty subset of the full requirement … maturity model (CMMI-DEV, Ver 1.3) considers the evaluation of these work activities to be part of its Project Monitoring and Control process. "A project'sSWE-129 - OCE NPR Appraisals
by administering software requirements, policy, procedures, processes, statutes, and regulations. The Headquarters' OCE uses continuing periodic oversight of compliance … engineering. The appraisal typically occurs during an OCE survey of a Center's processes and directives and through examinations of a project's official records