bannerd

Search

Search

Help

Page 1 of 13. Showing 129 results (0.009 seconds)

  1. 7.05 - Work Breakdown Structures That Include Software

    , and tracking of commitments from other organizations 5. Resources 5.1 Tools srr swrr acq_plan cm pf pi pp pm pm-c Migration of unmigrated content due
  2. 7.04 - Flowdown of NPR Requirements on Contracts and to Other Centers in Multi-Center Projects

    sam cd sa acq_plan pf pp plan pm pm-c Migration of unmigrated content due to installation of a new plugin … practices to be used.)           c. Come to agreement on a common/shared compliance matrix against NPR 7150.2, which is to be maintained by the lead Center
  3. 7.11 - Model Based Development and Auto-generated Code

    analysis pi pp pm c-i Migration of unmigrated content due to installation of a new plugin … engineers create a model of the system behavior that can then be translated into different languages such as C or Ada by the appropriate code generator. The model
  4. SWE-054 - Corrective Action for Inconsistencies

    ansc asc bsc bnsc csc cm dsc design g f esc ll pi pm c-i v-v pm-c Migration of unmigrated content due to installation of a new plugin … (e.g., report to Project Manager (PM)). A procedure to archive actions and conclusions for reference, input to future projects. Consult Center Process
  5. SWE-084 - Configuration Audits

    and [contractor]." cd smproj records pr sre ansc asc bsc bnsc csc cm dsc design g f esc ll pm c-i v-v pm-c Migration of unmigrated content due … any notes for this requirement. 1.2 Applicability Across Classes Classes C through E and Safety Critical are labeled, "SO." This means that this requirement
  6. SWE-066 - Perform Testing

    bnsc csc cnsc cdr ensc dsc dnsc g f esc ll pdr plan pm c-i v-v sir trr pm-c Migration of unmigrated content due to installation of a new plugin … 1. Requirements 3.4.2 The project shall perform software testing as defined in the Software Test Plan. 1.1 Notes A best practice for Class A, B, and C
  7. SWE-083 - Status Accounting

    ansc asc bsc bnsc csc cnsc cm dsc design g f esc h pi pm c-i v-v pm-c Migration of unmigrated content due to installation of a new plugin
  8. SWE-026 - Commitment Change Agreements

    for this requirement. cd smproj records process sre ansc asc bsc bnsc csc cnsc cm dsc g f esc pm pm-c Migration of unmigrated content due to installation of a new plugin
  9. SWE-040 - Access to Software Products

    bsc bnsc csc cnsc cm dsc g f esc ll pm m-a in-over pm-c acq_plan Migration of unmigrated content due to installation of a new plugin … any notes for this requirement. 1.2 Applicability Across Classes Class C not Safety Critical and Class G are labeled with "P (Center)." This means
  10. SWE-053 - Manage Requirements Changes

    cnsc cm ensc dsc dnsc g f esc ll pi pm pm-c Migration of unmigrated content due to installation of a new plugin