bannerd

Search

Search

Help

Page 1 of 3. Showing 28 results (0.006 seconds)

  1. 7.07 - Software Architecture Description

    , testing, and project management." sdr analysis design ll mdr pdr prod_desc Migration of unmigrated content due to installation of a new plugin
  2. 7.08 - Maturity of Life Cycle Products at Milestone Reviews

    for those elements which will all be considered for future updates to this chart. 7150.2 Software Life Cycle Products MCR SRR MDR SDR … Review,  SRR = System Requirements Review,  MDR = Mission Definition Review,  SDR = System Definition Review,  PDR = Preliminary Design Review,  CDR = Critical
  3. SWE-074 - Document Maintenance Plan

    reviewed and reviewed at project milestone reviews such as the Mission Concept Review (MCR), Software Requirements Review (SwRR), Mission Definition Review (MDR … csc cnsc cdr dsc g f esc ll pc mcr mdr pdr pp plan pm sar sus_engr Migration of unmigrated content due to installation of a new plugin
  4. SWE-032 - CMMI Levels for Class A, B, and C Software

    pc mcr mdr pf pi pp pm m-a pm-c favourite Migration of unmigrated content due to installation of a new plugin
  5. SWE-076 - Implement Operations, Maintenance, and Retirement Activities

    cdr dsc g f esc ll orr pc mcr mdr pi pdr plan pm sus_engr Migration of unmigrated content due to installation of a new plugin
  6. SWE-105 - Software Maintenance Plan

    that are referenced in SWE-074 of this Handbook. sam cd smproj sdr sa srr acq_plan ansc asc bsc bnsc csc cdr dsc g f esc ll orr pc mcr mdr pdr pp plan pm sar
  7. SWE-075 - Plan Operations, Maintenance, Retirement

    to enhance the product without tearing down and rebuilding the majority of code." sam cd sdr sa srr ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pc mcr mdr
  8. SWE-081 - Identify Software CM Items

    system configurations." export1 cd srr swrr ansc asc bsc bnsc csc cnsc cm cdr dsc dnsc g f esc ll h mdr pi pdr plan pm Migration of unmigrated
  9. SWE-103 - Software CM Plan

    cm cdr dsc dnsc g f esc ll mdr pi pdr pp plan pm pm-c bice Migration of unmigrated content due to installation of a new plugin
  10. SWE-079 - Develop CM Plan

    ), Mission Definition Review (MDR), etc. (see Topic 7.08 - Maturity of Life Cycle Products at Milestone Reviews). The SCM plan needs to be reviewed by software … ." export1 cd smproj srr swrr ansc asc bsc bnsc csc cnsc cm cdr dsc dnsc g f esc ll mdr pi pdr pp plan pm pm-c Migration of unmigrated content due to installation