bannerd

Search

Search

Help

Page 1 of 2. Showing 16 results (0.007 seconds)

  1. 7.08 - Maturity of Life Cycle Products at Milestone Reviews

    for those elements which will all be considered for future updates to this chart. 7150.2 Software Life Cycle Products MCR SRR MDR SDR … = Final,  D = Draft,  P = Preliminary,  B = Baseline,  U = Updated/Updated as required,  X = assume complete (final), not explicit in NPRs MCR = Mission Concept
  2. SWE-074 - Document Maintenance Plan

    reviewed and reviewed at project milestone reviews such as the Mission Concept Review (MCR), Software Requirements Review (SwRR), Mission Definition Review (MDR … csc cnsc cdr dsc g f esc ll pc mcr mdr pdr pp plan pm sar sus_engr Migration of unmigrated content due to installation of a new plugin
  3. SWE-032 - CMMI Levels for Class A, B, and C Software

    pc mcr mdr pf pi pp pm m-a pm-c favourite Migration of unmigrated content due to installation of a new plugin
  4. SWE-076 - Implement Operations, Maintenance, and Retirement Activities

    cdr dsc g f esc ll orr pc mcr mdr pi pdr plan pm sus_engr Migration of unmigrated content due to installation of a new plugin
  5. SWE-105 - Software Maintenance Plan

    that are referenced in SWE-074 of this Handbook. sam cd smproj sdr sa srr acq_plan ansc asc bsc bnsc csc cdr dsc g f esc ll orr pc mcr mdr pdr pp plan pm sar
  6. SWE-075 - Plan Operations, Maintenance, Retirement

    to enhance the product without tearing down and rebuilding the majority of code." sam cd sdr sa srr ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pc mcr mdr
  7. SWE-013 - Software Plans

    for this requirement. hqce sam smproj sdr sa sse srr train swrr ansc asc bsc bnsc csc cnsc cm cdr ensc dsc dnsc g f esc mcr mdr pdr pe pp plan pm c-i v-v m-a sir trr
  8. SWE-085 - Release Management

    f esc h mcr mdr pi pdr pe pm sar sus_engr Migration of unmigrated content due to installation of a new plugin
  9. SWE-086 - Continuous Risk Management

    smproj sdr sa sre sse srr swrr analysis ansc asc bsc bnsc csc cdr dsc design g f esc ll mcr mdr pf pi pdr pp plan pm c-i v-v m-a sar pm-c sus_engr Migration
  10. 7.14 - Implementing Measurement Requirements and Analysis for Projects

    . Resources 5.1 Tools reports records sdr pr sre srr tool swrr acq_plan analysis cdr design mcr mdr pdr pp plan pm c-i v-v m-a sar prr sir trr pm-c