bannerd

Search

Search

Help

Page 1 of 2. Showing 16 results (0.013 seconds)

  1. 7.08 - Maturity of Life Cycle Products at Milestone Reviews

    for those elements which will all be considered for future updates to this chart. 7150.2 Software Life Cycle Products MCR SRR MDR SDR … = Final,  D = Draft,  P = Preliminary,  B = Baseline,  U = Updated/Updated as required,  X = assume complete (final), not explicit in NPRs MCR = Mission Concept
  2. SWE-074 - Document Maintenance Plan

    reviewed and reviewed at project milestone reviews such as the Mission Concept Review (MCR), Software Requirements Review (SwRR), Mission Definition Review (MDR … csc cnsc cdr dsc g f esc ll pc mcr mdr pdr pp plan pm sar sus_engr Migration of unmigrated content due to installation of a new plugin
  3. SWE-076 - Implement Operations, Maintenance, and Retirement Activities

    cdr dsc g f esc ll orr pc mcr mdr pi pdr plan pm sus_engr Migration of unmigrated content due to installation of a new plugin
  4. SWE-075 - Plan Operations, Maintenance, Retirement

    to enhance the product without tearing down and rebuilding the majority of code." sam cd sdr sa srr ansc asc bsc bnsc csc cnsc cdr dsc g f esc ll pc mcr mdr
  5. SWE-013 - Software Plans

    for this requirement. hqce sam smproj sdr sa sse srr train swrr ansc asc bsc bnsc csc cnsc cm cdr ensc dsc dnsc g f esc mcr mdr pdr pe pp plan pm c-i v-v m-a sir trr
  6. 7.09 - Entrance and Exit Criteria

    )). Mission Concept Review (MCR) The MCR affirms the mission need and examines the proposed mission's objectives and the concept for meeting those objectives … of Magnitude (ROM) budget and schedules are presented. (NPR 7120.5 ) Jump to: Entrance Criteria | Items Reviewed | Exit/Success Criteria entrance.png MCR Entrance
  7. 7.03 - Acquisition Guidance

    Tools cd reports sdr sm srr tool acq_plan analysis ansc asc bsc bnsc csc cnsc cdr ensc dsc dnsc g esc mcr mdr pf plan pm in-over sar prr sir trr
  8. SWE-014 - Execute Planning

    swrr ansc asc bsc bnsc csc cnsc cm cdr ensc dsc dnsc design g f esc mcr mdr pdr pe pp plan pm c-i v-v m-a sir trr pm-c sus_engr Migration of unmigrated content
  9. SWE-048 - Solicitation

    for this lesson. cd sdr sa process sm srr swrr acq_plan ansc asc bsc bnsc csc cnsc cdr dsc dnsc g f esc ll mcr mdr pdr pm in-over sir trr pm-c Migration
  10. SWE-102 - SW Development-Management Plan

    smproj sdr sa sse srr train swrr ansc asc bsc bnsc csc cnsc cm cdr dsc dnsc g f esc ll mcr mdr pdr pe pp plan pm m-a pm-c Migration of unmigrated content due