bannerd

Search

Search

Help

Page 1 of 13. Showing 130 results (0.011 seconds)

  1. SWE-026 - Commitment Change Agreements

    Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requirement. 1.2 Applicability Across Classes Class G … for this requirement. cd smproj records process sre ansc asc bsc bnsc csc cnsc cm dsc g f esc pm pm-c Migration of unmigrated content due to installation of a new plugin
  2. SWE-027 - Use of Commercial, Government, and Legacy Software

    Classes Class G is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can … of COTS products should be encouraged whenever practical in exploration programs. cd smproj sm acq_plan ansc asc bsc bnsc csc cnsc dsc g f esc ll pf pm
  3. SWE-115 - Software User Manual

    of the software. Class F and Class G are labeled with "X (not OTS)."  This means that this requirement does not apply to off-the-shelf software … dsc g f esc orr pi pm prod_desc Migration of unmigrated content due to installation of a new plugin
  4. SWE-139 - Shall Statements

    g f esc h pm Migration of unmigrated content due to installation of a new plugin
  5. SWE-095 - Directorate Measurement System

    stress tests." hqce reports records process ansc asc bsc bnsc csc cnsc dsc g f esc ll Migration of unmigrated content due to installation of a new
  6. SWE-109 - Software Requirements Specification

    partitioning for phased delivery. f.     Testing requirements that drive software design decisions (e.g., special system level timing requirements/checkpoint restart). g … cnsc cdr dsc dnsc g f esc ll pi pdr pm prod_desc Migration of unmigrated content due to installation of a new plugin
  7. SWE-018 - Software Activities Review

    Class G is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used … cnsc cm dsc dnsc g f esc ll pm m-a pm-c Migration of unmigrated content due to installation of a new plugin
  8. SWE-019 - Software Life Cycle

    for this requirement. 1.2 Applicability Across Classes Class D and Not Safety Critical and Class G are labeled with "P (Center)." This means that an approved … , while Design, Code & Test, and Release & Maintenance are part of the Implementation phase.                     Fig 3.2.png                    Figure 3.2
  9. SWE-130 - Develop a Software Safety Plan

    identified for this requirement. hqce sam csma smproj sdr sa sse srr swrr acq_plan ansc asc bsc bnsc csc cm cdr dsc g f esc h pdr pe plan pm bp sar Migration
  10. SWE-005 - Software Processes

    dnsc g f esc ll h pf pe bp Migration of unmigrated content due to installation of a new plugin