bannerd

Search

Search

Help

Page 1 of 6. Showing 56 results (0.01 seconds)

  1. 7.05 - Work Breakdown Structures That Include Software

    , contractor mgmt, risk, CM, training, IV&V coord, lesson learned, etc) SW Requirements Management SW Testbed Management CSCI Development CSCI Test CSC Test … , and tracking of commitments from other organizations 5. Resources 5.1 Tools srr swrr acq_plan cm pf pi pp pm pm-c Migration of unmigrated content due
  2. SWE-026 - Commitment Change Agreements

    for this requirement. cd smproj records process sre ansc asc bsc bnsc csc cnsc cm dsc g f esc pm pm-c Migration of unmigrated content due to installation of a new plugin
  3. 7.12 - Qualification of Flight Software

    process activities of configuration management (CM), assurance, Verification and Validation (V&V), and reviews.  Additional guidance regarding the plans … of flight software are described in the CM plan (see SWE-103). Guidance for recording information, associated with qualification activities, is found in SWE-078
  4. SWE-018 - Software Activities Review

    cnsc cm dsc dnsc g f esc ll pm m-a pm-c Migration of unmigrated content due to installation of a new plugin
  5. SWE-130 - Develop a Software Safety Plan

    identified for this requirement. hqce sam csma smproj sdr sa sse srr swrr acq_plan ansc asc bsc bnsc csc cm cdr dsc g f esc h pdr pe plan pm bp sar Migration
  6. SWE-005 - Software Processes

    verification activities. Manage FSW development using an integrated system. hqce csma cce cd records sa process train ansc asc bsc bnsc csc cnsc cm ensc dsc
  7. SWE-077 - Deliver Software Products

    bnsc csc cnsc cm ensc dsc dnsc g f esc ll orr pc pm prod_desc sar sus_engr Migration of unmigrated content due to installation of a new plugin
  8. SWE-126 - Waiver and Deviation Considerations

    records srr swrr ansc asc bsc bnsc csc cnsc cm ensc dsc dnsc g f esc ll h plan pm in-over Migration of unmigrated content due to installation of a new plugin
  9. SWE-140 - Partial Center (P(Center)) Requirements

    . hqce cce smproj sa srr swrr ansc asc bsc bnsc csc cnsc cm ensc dsc dnsc g f esc h pm Migration of unmigrated content due to installation of a new plugin
  10. SWE-079 - Develop CM Plan

    requirement can be used to achieve this requirement. 2. Rationale "The discipline of CM (configuration management) is vital to the success of any software effort. CM is an integrated process for identifying, documenting, monitoring, evaluating, controlling, and approving all changes made during the life-cycle