SWE-133 - Last used in rev NPR 7150.2B
Rev | SWE Statement |
---|---|
A | 2.2.8.3 The project, in conjunction with the Safety and Mission Assurance organization, shall determine the software safety criticality in accordance with NASA-STD-8739.8. |
Difference between A and B | Changed the NASA standard. |
B | 3.5.3 The project manager, in conjunction with the Safety and Mission Assurance organization, shall determine the software safety criticality in accordance with NASA-STD-8719.13. |
Difference between B and C | Last used in Rev B; requirement merged into SWE-205. |
C | DELETED |