SWE-131 - Last used in rev NPR 7150.2D

RevSWE Statement
A

2.2.1.3 If a project is selected for software Independent Verification and Validation (IV&V) by the NASA Chief, Safety and Mission Assurance, the NASA IV&V program shall develop an IV&V Project Execution Plan (IPEP).

Difference between A and BRemoves the requirement for the OSMA Chief selection of projects for IV&V;
otherwise, no change
B

3.6.3 If software IV&V is performed on a project, the project manager shall ensure that an IV&V Project Execution Plan (IPEP) is developed.

Difference between B and CAdded to the requirement that the IPEP is "negotiated, approved, maintained, and executed."
C

3.6.3 If software IV&V is performed on a project, the project manager shall ensure an IPEP is developed, negotiated, approved, maintained, and executed. 

Difference between C and DClarified requirement and referenced the NASA standard for software safety and assurance.
D

3.6.3 If software IV&V is required for a project, the project manager, in consultation with NASA IV&V, shall ensure an IPEP is developed, approved, maintained, and executed in accordance with IV&V requirements in NASA-STD-8739.8.