SWE-131 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | 2.2.1.3 If a project is selected for software Independent Verification and Validation (IV&V) by the NASA Chief, Safety and Mission Assurance, the NASA IV&V program shall develop an IV&V Project Execution Plan (IPEP). |
Difference between A and B | Removes the requirement for the OSMA Chief selection of projects for IV&V; otherwise, no change |
B | 3.6.3 If software IV&V is performed on a project, the project manager shall ensure that an IV&V Project Execution Plan (IPEP) is developed. |
Difference between B and C | Added to the requirement that the IPEP is "negotiated, approved, maintained, and executed." |
C | 3.6.3 If software IV&V is performed on a project, the project manager shall ensure an IPEP is developed, negotiated, approved, maintained, and executed. |
Difference between C and D | Clarified requirement and referenced the NASA standard for software safety and assurance. |
D | 3.6.3 If software IV&V is required for a project, the project manager, in consultation with NASA IV&V, shall ensure an IPEP is developed, approved, maintained, and executed in accordance with IV&V requirements in NASA-STD-8739.8. |