SWE-122 - Last used in rev NPR 7150.2C

RevSWE Statement
A

6.2.1 The designated Engineering Technical Authority(s) for requirements in this NPR, which can be waived at the Center level, shall be approved by the Center Director.

Difference between A and BSpecifies that the Center TA must be a NASA civil servant.
B

2.1.3.5 The designated Center Engineering Technical Authority(s) for requirements in this NPR that can be waived or deviated at the Center level shall be NASA civil servants (or JPL/CalTech employees) approved by the Center Director.

Difference between B and CAdded Institutional Authority(s) to the requirement;
Increase the scope of responsibility by removing "that can be waived or deviated at the Center level";
Changed "CalTech" to "Contractor";
Removed the requirement for the appointee to be approved by the Center Director.
C

2.1.5.5 The designated Center Engineering Technical Authority(s) or Institutional Authority(s) for requirements in this NPR shall be NASA civil servants (or JPL/Contractor employees).

Difference between C and DRetired SWE
DDELETED