bannerd

SWE-092 - Last used in rev NPR 7150.2D

RevSWE Statement
A

4.4.3 The project shall specify and record data collection and storage procedures for their selected software measures and collect and store measures accordingly.

Difference between A and BRe-write of software measures requirement to not just collect and store but to utilize the data.
B

2.1.3.10 For Class A, B, C, and safety-critical software projects, the Center Director shall utilize software measurement data for monitoring software engineering capability, improving software quality, and tracking the status of software engineering improvement activities.

Difference between B and CRemoved "safety-critical" from the requirement.
C

2.1.5.10 For Class A, B, and C software projects, the Center Director, or designee, shall utilize software measurement data for monitoring software engineering capability, improving software quality, and to track the status of software engineering improvement activities.  

Difference between C and DNo Change
D

2.1.5.8 For Class A, B, and C software projects, the Center Director, or designee, shall utilize software measurement data for monitoring software engineering capability, improving software quality, and to track the status of software engineering improvement activities. 



  • No labels