SWE-087 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | 4.3.1 The project shall perform and report on software peer reviews/inspections for:
|
Difference between A and B | Added item e. Software test procedures to the requirement. Broadened the scope of the plans to be reviewed to include all Plans, not just the Test Plan. |
B | 5.3.2 The project manager shall perform and report the results of software peer reviews or software inspections for:
|
Difference between B and C | No change |
C | 5.3.2 The project manager shall perform and report the results of software peer reviews or software inspections for:
|
Difference between C and D | Added cybersecurity plans to part b. |
D | 5.3.2 The project manager shall perform and report the results of software peer reviews or software inspections for: a. Software requirements. |