SWE-072 - Last used in rev NPR 7150.2B
Rev | SWE Statement |
---|---|
A | 3.4.8 The project shall provide and maintain bidirectional traceability from the Software Test Procedures to the software requirements. |
Difference between A and B | No change |
B | 4.5.9 The project manager shall provide and maintain bidirectional traceability from the software test procedures to the software requirements. |
Difference between B and C | Last used in Rev B; Requirement merged into SWE-052 |
C | DELETED |