SWE-070 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | 3.4.6 The project shall verify, validate, and accredit software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
Difference between A and B | Changed project's responsibility to verify, validate, and accredit to just use ones that have been validated and accredited. |
B | 4.5.7 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
Difference between B and C | No change |
C | 4.5.6 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
Difference between C and D | No change |
D | 4.5.6 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |