SWE-069 - Last used in rev NPR 7150.2B
Rev | SWE Statement |
---|---|
A | 3.4.5 The project shall document defects identified during testing and track to closure. |
Difference between A and B | No change |
B | 4.5.6 The project manager shall record defects identified during testing and track to closure. |
Difference between B and C | Last used in Rev B; Requirement covered by SWE-065c and SWE-201. |
C | DELETED |