SWE-067 - Last used in rev NPR 7150.2B
Rev | SWE Statement |
---|---|
A | 3.4.3 The project shall ensure that the implementation of each software requirement is verified to the requirement. |
Difference between A and B | No change |
B | 4.5.4 The project manager shall verify the requirement to the implementation of each software requirement. |
Difference between B and C | Last used in Rev B; Requirement merged into SWE-194 and SWE-066. |
C | DELETED |