SWE-052 - Last used in rev NPR 7150.2D
Rev | SWE Statement | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A | 3.1.1.4 The project shall perform, document, and maintain bidirectional traceability between the software requirement and the higher-level requirement. | ||||||||||||||||||||||||||||
Difference between A and B | No change | ||||||||||||||||||||||||||||
B | 4.1.2.3 The project manager shall perform, record, and maintain bidirectional traceability between the software requirement and the higher-level requirement. | ||||||||||||||||||||||||||||
Difference between B and C | Specified traceability based on SW Classification by adding Table 1 in NPR-7150.2C.; | ||||||||||||||||||||||||||||
C | 3.12.1 The project manager shall perform, record, and maintain bi-directional traceability between the following software elements:
| ||||||||||||||||||||||||||||
Difference between C and D | Updated table to change 'test procedures' to 'verification(s)' | ||||||||||||||||||||||||||||
D | 3.12.1 The project manager shall perform, record, and maintain bi-directional traceability between the following software elements:
|